EU Cookie Consent
We use cookies on this website to provide statistics that help us give you the best experience. By continuing to use the site without changing settings, you are agreeing to our use of cookies. Read Privacy Policy
0 Artículo está en su carrito Ver carrito ahora
Términos y Condiciones del Listado
All product and company names are trademarks of their respective holders. Use of them does not imply any affiliation with or endorsement or sponsorship by them.
The NFPA 99 compliant digital, fully automatic manifold requires no manual resetting of valves or levers. The unit switches from "Bank in Use" to "Reserve" bank without fluctuation in line delivery pressure. Simultaneously, the "Reserve in Use" alarm is triggered by the manifolds microprocessor. The manifold will continue to provide gas, in the event of a power failure, until both banks are depleted.
After the switchover, the "Reserve" bank will then become the "Bank in Use". The manifold microprocessor shall also trigger the "High Line Pressure" and "Low Line Pressure" alarms without the need for additional pressure switches or transducers. The manifold shall be capable of being upgraded after installation, to be used with low or medium pressure portable bulk vessels or for use at higher or lower delivery pressures.
The control panel incorporates three large, green, illuminated LED displays, for the Left Bank, the Right Bank, and for Delivery Pressure. Analog gauges are also provided so that line and both bank pressures may be observed in the event of a power failure. The control panel also incorporates a set of LED's for each bank, green for "Bank in Use", amber for "Ready" and red for "Empty". All manifold regulators, piping and control switching equipment shall be cleaned for use with oxygen service and installed in a steel cabinet (weatherproof version available) to provide protection and minimize tampering.
The header bars are equipped with emergency high pressure shutoff valves outside the cabinet to allow for emergency isolation of the header bars. The header bar shall incorporate integral check valves for each station.